Free tool · no sign-up
Meta-analysis calculator
Pool your studies with fixed or random effects: the pooled effect with its confidence and prediction intervals, I², τ² and Q, each study's weight, and what changes when each study is left out.
- Results match R's metafor: see the checks
- With a forest plot to download
- Updates as you type; nothing saved
Pooled result
−2.17
Mean difference, 5 studies, Random effects (REML)
- 95% confidence interval
- −2.84 to −1.50
- 95% prediction interval
- −2.84 to −1.50
- Test for an overall effect
- z = −6.34, p < 0.001
- I²
- 0.0%
- τ² (between-study variance)
- 0.0000
- Q (heterogeneity)
- 2.87, df = 4, p = 0.580
For your results section
Pooling 5 studies with a random-effects model (REML), the mean difference was −2.17 (95% CI −2.84 to −1.50; p < 0.001). Heterogeneity: I² = 0%, τ² = 0.000, Q = 2.87 (df = 4, p = 0.580). The 95% prediction interval was −2.84 to −1.50. Egger's test for funnel plot asymmetry gave t = 1.60 (df = 3, p = 0.208).
Meta-analysis questions
What is I²?
The share of the variation between studies' results that comes from real differences between them rather than chance, from 0% to 100%. As a rough guide, the Cochrane Handbook suggests 0–40% might not be important, 30–60% may be moderate, 50–90% substantial and 75–100% considerable heterogeneity.
What is τ²?
Tau squared is the variance of the true effects between studies, on the analysis scale (log scale for ratios). Unlike I², it doesn't depend on how precise the studies are. It's 0 for a fixed-effect model.
What is a prediction interval?
Where the true effect in a new study like these would probably fall, given how much effects vary between studies. It's wider than the confidence interval, which only says where the average effect is. Reporting it helps readers see whether the effect is consistent.
Should I use the Hartung–Knapp adjustment?
It's worth considering, especially with few studies. A random-effects model estimates τ² from the studies themselves, and the usual intervals ignore the uncertainty in that estimate, so they're often too narrow. The Hartung–Knapp (or Hartung–Knapp–Sidik–Jonkman) adjustment allows for it, using the t distribution with k − 1 degrees of freedom. When the studies agree closely it can give a narrower interval than the usual one, so report which you used.
How do I run a subgroup analysis?
Add a last column naming each study's subgroup, such as its dose, setting or design. Each subgroup is pooled on its own, the forest plot shows each one's subtotal, and the test for subgroup differences says whether the groups' effects differ more than chance would explain. Plan subgroups in your protocol, and read them with caution: they're observational comparisons.
How do I check for publication bias?
With ten or more studies, look at the funnel plot and Egger's test. Each study is a dot: its effect across, its standard error down. Without small-study effects the dots scatter evenly around the pooled estimate, inside the dashed funnel. Egger's test (Egger et al., 1997) checks whether the funnel is lopsided. With fewer than ten studies the test has little power.
What does leave-one-out show?
The pooled result recalculated without each study in turn. If leaving one study out changes the conclusion, the result depends heavily on that study, which is worth reporting as a sensitivity analysis.
How many studies do I need?
Two at the least, but with few studies τ² is estimated poorly and random-effects results should be read with caution. Tests for publication bias need around ten or more.
Are the results checked?
Yes: the calculations follow the Cochrane Handbook (chapter 10) and give the same results as R's metafor package, the reference software for meta-analysis, which the tests check.
How to cite this tool
If it helped your review, please cite it in your methods, alongside the methods it uses.
APA
Systeamatic. (2026). Meta-analysis calculator [Computer software]. https://systeamatic.com/meta-analysis-calculator
Vancouver
Systeamatic. Meta-analysis calculator [Internet]. 2026 [cited 2026 Nov 28]. Available from: https://systeamatic.com/meta-analysis-calculator
BibTeX
@misc{systeamatic_metaanalysis_2026,
author = {{Systeamatic}},
title = {Meta-analysis calculator},
year = {2026},
howpublished = {\url{https://systeamatic.com/meta-analysis-calculator}},
url = {https://systeamatic.com/meta-analysis-calculator},
note = {Accessed 2026-11-28}
}About this tool
Subgroups are pooled separately, each with its own τ², as RevMan does by default; with very few studies in a subgroup (and especially with the Hartung–Knapp adjustment) its interval can be very wide. Effects and pooling follow the Cochrane Handbook for Systematic Reviews of Interventions (chapters 6 and 10): inverse-variance weights, with τ² by restricted maximum likelihood (REML) or DerSimonian and Laird. For risk and odds ratios, 0.5 is added to every cell of a study with a zero, and studies with no events in either group are left out. I² is worked out from Q, as RevMan reports it (metafor's REML output works it out from τ², so it can differ slightly). Results are checked against R's metafor package.
- Higgins JPT, Thomas J, Chandler J, et al. (editors). Cochrane Handbook for Systematic Reviews of Interventions, version 6.5. Cochrane, 2024.
- Viechtbauer W. Conducting meta-analyses in R with the metafor package. Journal of Statistical Software 2010;36(3):1–48.
- DerSimonian R, Laird N. Meta-analysis in clinical trials. Controlled Clinical Trials 1986;7:177–188.
- Egger M, Davey Smith G, Schneider M, Minder C. Bias in meta-analysis detected by a simple, graphical test. BMJ 1997;315:629–634.
Disclaimer
This tool is provided free and as is: check your results before you publish them. We don't save or log what you enter: it lives only in this page's address. See our terms and privacy policy.
Also free: the forest plot maker, the PRISMA 2020 diagram generator and the kappa calculator.
From extraction to forest plot, in one place
In Systeamatic, the numbers you extract from each study go straight into the meta-analysis: pick an outcome and see its forest plot, with no copying between spreadsheets.
See how it works